Southern Concrete Services were appointed by SWH Build as a specialist sub contractor to undertake major structural repair works at Hinton Road Multi-story Car park.
As a busy car park in central Bournemouth, with some areas occupied by a car rental company and other areas by the adjacent hotel, the existing structure had suffered from weathering and lack of maintenance.
The works involved dismantling large sections of the facades, replacing steel work and encasing in micro-concrete. Many defects required specialist propping prior to commencement.
During the works, Southern Construction Solutions carried out concrete repairs using MonoTop 610, 615 and 620, Sikagard 675 was applied to all concrete surfaces. A high spec 4 coat system was used on all steel surfaces. The masonry was installed to meet current standards.
The works were undertaken whilst the car park remained fully operational.
Project Outline:
Structural steel and concrete Repairs. Plus replacement and application of specialist coatings.
Wessex Water’s treatment works treat millions of litres of sewage every day. Southern Concrete Services were contracted by Damar Group to assist in the renovation
Southern Construction Solutions were appointed by Jordan & Faber as a specialist subcontractor to undertake Lintel replacements to 17 window openings on Assett WTO 68
Southern Concrete Services were employed by NHBC as a specialist principal contractor to undertake an investigation and subsequent repairs to rotten timbers at Viewpoint flats
Quality is driven throughout the company by senior management through to site tradespersons. We hold quality assurance standard ISO9001 which means that all of our processes are monitored and audited throughout the project lifetime to ensure that works are carried out in accordance with the specification and agreed standards.